A310 EASA Part-66 (GE CF6, JT9 or PW 4000)Airframe / Power Plant Cat. B1.1
Level III (Avionic Chapter Level II)
Line and Base Maintenance Training
(per ATA 104)
30 Days 8 Units each
5 Tests, Multiple Choice
ATA
Units
00
Aircraft General
8 Units
21
Air Conditioning
12 Units
22
Auto Flight
6 Units
23
Communication
4 Units
24
Electrical Power
10 Units
25
Equipment / Furnishing
26
Fire Protection
27
Flight Controls
32 Units
28
Fuel
29
Hydraulic Power
30
Ice&Rain Protection
31
ECAM
32
Landing Gear
20 Units
33
Lights
34
Navigation
35
Oxygen
36
Pneumatic
38
Water / Waste
49
APU
50
Structure
52
Doors
70-80
Power Plant
40 Units
Test
TOTAL :
240 Units